The maximum transfer size of the stedma40 is (64k-1) x data-width.
If the transfer size of one element exceeds this limit
the job is split up and sent as linked transfer.
Signed-off-by: Per Forlin <per.forlin@linaro.org>
Signed-off-by: Dan Williams <dan.j.williams@intel.com>
LLI allocation is now done on job level instead of channel level.
Previously the maximum length of a linked job in hw on a logical
channel was 8, since the LLIs where evenly divided. Now only
executing jobs have allocated LLIs which increase the length to
a maximum of 64 links in HW.
Signed-off-by: Jonas Aaberg <jonas.aberg@stericsson.com>
Signed-off-by: Linus Walleij <linus.walleij@stericsson.com>
Signed-off-by: Dan Williams <dan.j.williams@intel.com>
We don't want interrupts when the source is done, only when
the destination is done and everything is complete at the
recieveing end of a transfer.
Signed-off-by: Jonas Aaberg <jonas.aberg@stericsson.com>
Signed-off-by: Linus Walleij <linus.walleij@stericsson.com>
Signed-off-by: Dan Williams <dan.j.williams@intel.com>