
Add check for concurrency with SR, if SR with concurrency is not enabled then disable the SR on existing VDEV as soon as new VDEV is up. When this new VDEV is disconnected, then enable back the SR on the previous VDEV. Change-Id: Id6aee592b889bb7006efb44420e6d272212e13ba CRs-Fixed: 3306181