
If START request is deferred due to RESTART pending logic, in few cases it is leading to configuring two channels to FW. This change checks desired channel of START req deferred VDEVs and updates the desired channel with RESTART VDEV's desired channel Change-Id: Ic69c10c08fd4d83aafcab97a71ce906564ab51f6 CRs-Fixed: 2713931